
Vapour control in insulation systems depends on the design of the complete assembly and its joints, not on one product alone.
Review system details
Identify the facing, joints, penetrations and required project performance. Verify tape compatibility with the facing and any required certification against manufacturer documentation.
Inspect installation
Follow manufacturer instructions on joint and penetration overlaps. Check for wrinkles and gaps and obtain an assessment from the project professional where needed.